A guidance of how to choose a steel storage silo

Excellent technology and management

Each steel silo project must be equipped with the construction personnel as following: project manager, project engineer, engineering technician, engineering information officer, front-line management personnel, front line operators and so on. In the construction of steel silos, strictly accordant with the requirements of the specification, follow the highest standards for technical disclosure, pay close attention to process management. Flyer is a steel silo supplier with years of experience and an experienced construction team. With a strong back up of a technology team and strong company strength.Flyer steel silo company is responsible to every front line staff and is responsible to every client of ours. In the construction of the steel silo and supporting frame, the safety consciousness of the employees is upheld, life is loved, and safety is concerned. Safety is the source of happiness, safety is the guarantee of effectiveness. The quality of steel silo is as heavy as the mountain to motivate employees and urge them to pay attention to safety. Careful design is the soul of engineering quality. Standard construction is the foundation of project quality. Strict supervision is the key to project quality. Government supervision is the guarantee of project quality. The steel silo is highly constructive, requires a simple foundation, and is quick to construct, independent of weather conditions. After understanding the superior performance of the steel silo, users should pay attention to the following issues during construction.
silo construction

The choice of steel silo materials

steel silo usually choose the ordinary type of steel, with Q235 as the best, easy to draw, and low cost. If the silo wall thickness of the silo is calculated to exceed the capacity of the equipment, low alloy steel is used instead of Q235. Silo silo panels are usually galvanized to meet corrosion protection requirements. Therefore, the galvanized layer has become an important indicator for the construction of the silo. It directly affects the service life of the silo. China's standards are in line with foreign standards and require a galvanizing amount of 400 g/m2. All our steel plates meet the standard and have a better quality.

Choice of silo form

Second, the choice of silo form: The popular thin-walled silo is advantageous for both the squat silo and lipp silo. They have their own characteristics due to their different structural forms.
Our company mainly provide the construction of Lipp silo.

Features of Lipp silo

  • Using hot galvanized coil continuous undercut forming, the color is uniform;
  • High airtight. It can store water, oil and other liquid materials;
  • Due to the silo wall is smooth, the required thickness is larger than the assembly silo.

Features of assembly silo

  • It can be used hot-dip galvanized coil, flat, can also use electro-galvanized sheet.
  • All parts are standard components and replaceable. Users in the course of use, such as damage or corrosion, you can easily replace the damaged parts to extend the service life.
  • It can be modified, demolition, especially for users of rental space is very suitable.
  • It can achieve the form of external columns, the flow of food in the silo is more favorable.
  • Air tightness is worse than lipp silo, but after the use of silicone sealant, airtight requirements can be achieved.
  • Double-layer insulation structure can be conveniently realized with little increase in cost.

The basic form of steel silo selection

different types of silo
The basic form of steel silo with two kinds of flat bottom and hopper bottom.
Flat bottom silo: general large-diameter silo application, need to be equipped with sweeping machine or manual clearance, this type of construction is relatively easy, lower cost .
Hopper bottom: Taking into account the self-flow of grains, the hopper bottom form is used in large numbers, and the hopper bottom is divided into three types: steel cone, semi-steel cone and cement cone. From the use of speaking, the three are not much different. , but there is a way to use backfill. Filling a conical bucket in the silo, although this method reduces the difficulty in the construction process, it wastes the material and capacity of the steel silo and increases the amount of civil engineering work.

2018年6月1日星期五

How to build a steel silo?

About Flyer Lipp silo

Lipp steel silo is also called Spiral steel silo. As a storage tool, the main role of the steel silo is to storage grain, fly ash, slag powder, cement, chemical and so on.
Lipp steel silo double seam technology is a patented technology of the German technical engineer called Xavef Lipp. It applies the principle of metal plastic working hardening and thin shell structure. Use special technology and equipment to apply 2 to 4 mm thick galvanized steel (or stainless steel). According to the “spiral, double-seam and cleanching" process to create a Lipp steel storage silo with a volume of 100 to 5000 m3.
Lipp steel silo, also known as spiral steel silo, as the name implies, the whole silo body is spiraled and concatenated by using professional equipment. The Lipp technical silo has a short construction period, a relatively low cost, and a good quality. It occupies a small area, has no scaffolding on the floor to install the silo top, and is easy to construct. In recent years, due to the superior performance and other advantages of Lipp silo, the steel silos have quickly occupied the silo market. Steel silos now are wildly used in grain storage and other industrial powder storage.

Preparation of steel storage silo

Customized design

Once the order is settled. Generally, customers need to provide their design drawing of the steel silo. We can also provide free design for customers. Customers are required to provide our designing team detail data such as material to contain, field scale, special demand and so on. The design drawing must be confirmed by both customers and our company to make sure the safety and the veracity, also to avoid unnecessary divergence.
silo design description

Preferential Capacity Table

This is a table that summarized by our technology with years experience and test, this table is a reference to these who have no idea how large their want their silos to be. According to this table. The standard silo is both aesthetically and practically.
The minimum diameter of the steel storage silo is 3meters and the maximize is 28 meters. The angle of the conical top is recommend to be 15°.

table header 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
4 75 88 100 113 126 138 151 163 176 188 201                  
5 118 137 157 177 196 216 236 255 275 295 314 334 353              
6     226 254 283 311 339 367 396 424 452 480 509              
7         385 423 462 500 539 577 615 654 693 731 770          
8         502 553 603 653 703 754 804 854 904 955 1005 1056 1106      
9             763 827 890 954 1017 1081 1145 1208 1272 1336 1400      
10             942 1021 1099 1178 1256 1335 1413 1492 1570 1649 1728      
11             1140 1235 1330 1425 1520 1615 1710 1805 1900 1996 2091      
12             1356 1470 1583 1696 1808 1922 2035 2148 2261 2374 2487 2601 2714 2827
13                1592 1725 1857 1990 2122 2255 2388 2521 2653 2786 2919 3053 3186 3318
14                     2308 2462 2616 2769 2923 3077 3231 3385 3559 3695 3848
15                    2649 2826 3003 3179 3356 3533 3709 3886 4062 4241 4418
16                         3617 3818 4019 4220 4421 4624 4825 5027
17                         4048 4310 4537 4764 4991      
18                            4578 4832 5087 5341 5595      
19                         5101 5384 5668 5951 6234      
20                         5652 5966 6280 6594 6908      
22                         6842 7223 7603 1982 8362      
24                         8143 8595 9048          
25                         8835 9326 9817          

Semi-finished steel parts

Because of filed limited, some welded parts will be pre-manufactured and packed in our factory before delivery to best save cost on construction site and shorten construction duration. These may include all accessory parts, steel plate and other parts. Our steel plate and all accessories are all made of galvanized steel sheet.
semi-pack-in-factory semi pack in factory semi pack in factory
semi pack in factory semi pack in factory semi pack in factory

On site construction procedure of Flyer steel storage silo

There are seven steps for on site construction procedure. The core of the construction is by using our spiral folding technology, it is also a symbol of Lipp silo unique technology which is different from other type of steel storage silo.
lipp silo technology
The main equipment that used in the construction process are decoiling machine, forming machine, bending machine and supporting bears. The use of these equipment will be introduced elaborately in the following steps.

steel silo on site construction

on site silo construction steps

Equipment location

The first thing to do is locate all the necessary equipment on the decided on site location. There should be prepared concrete base or steel frame base. The selection of base is depend on different elements. P.S. The base construction does not contained in our bossiness scope. The diameter of the base is according to the size of the steel storage silo. When all the equipment are settled in the correct place, the construction of steel storage silo process can be started.
equipment forming equipment supporting bears

Silo bending

First of all, Use the decoiling machine to decoil the galvanized steel strip coils. During the construction process, the decoiled steel strip will be delivered to the forming machine. The forming machine will bend the steel strips to a certain radian according to the request of the target steel storage silo. With the help of silo forming machine, the bended steel strips after the bending machine can be seamed together to the double-seam system.
When the steel galvanized steel strip coils formed into double system, we need to use supporting bears to support the whole construction of the silo and make sure with the help of bearing support, the whole structure can keep rising.
silo bending silo bending silo bending

Silo roof installation

Accompanying with the rising of the whole body, when the main body of the silo raises to a certain height, normally 2 meters high. Our workers will start to install the roof of the silo. Because the height of silo is range from 6 meters to 25meters, which is too high that the safety of workers can not be guaranteed. After the installation of the roof, the forming and bending will continue and the silo will keep raising.
top inside

Stiffeners fixing

With the raising of the silo, our worker will start to weld the steel stiffeners. Steel stiffeners are used to help the structure of the silo more stable and makes the silo lasting long and hard to collapse. We also use double stiffener plates to ensure the stability of stiffeners.
stiffener fixing stiffener fixing

Silo lifting

For some small diameters steel storage silos or silos built on the ground. We usually use a crane to lift the whole body to load the steel silo on the basement. The main part of the silo has been complete.
silo lifting silo-lifting

Auxiliary equipment installation

After finished the silo body construction. Customers will always order some auxiliary equipment fixed on the silo that used to maintain and check the condition of the silo. There are some necessary auxiliary equipment, such as roof air vent, used to keep the air flowing, the ladder system, build by the side of the silo, and other auxiliary to make up the whole silo system.
air vent silo gate ladder
We undertake turn key project from equipment location to auxiliary equipment installation, this does not only because we can ensure the quality of whole parts but also you can get the most cost effective offer.
If you get any question, you can send us e-mail, we are wiling to answer your questions.

2018年5月31日星期四

How To Make The Lychee Juice At Home?

What is the methods and steps of homemade lychee juice?
  1. Select some lychees to spare, and then put them together in the container. The amount of quantity depends on the individual situation.
  2. Peel the selected lychees, then rinse them and put them into the container.
  3. After peeling and rinsing, you can cut the pulp with a knife. Of course, the core is not edible. Be careful not to cut it up.
  4. Litchi that cuts the flesh can be wasted a little, and the pulp close to the core can be thrown away. If you can't bear to throw it away, clean it out and pick it up one by one.
  5. Pour the cut litchi into the juicy cup. We must pay attention to the fact that litchi is cut into small pieces, not too big!
  6. Add proper amount of cold water to the juicer and cover it well.
  7. Cover the lid and stir in the juicer.
  8. Twist the juice cup, and then it starts to buzz, and of course, the fruit juice is shaped.
  9. If it feels bad, you can continue to grind again.
  10. You can pour the lychee juice out and drink it.

2018年5月27日星期日

Problems and solutions of decreasing of the flour mill equipment

How to clean up the complete set of equipment for wheat milling process? Many flour business owner that use the flour mill equipment of our company or other companies are not properly.There are many factors that may cause breakdown or low effect of the flour mill equipment.

Factors that may cause problem

  • They do not clean and maintain the machine, resulting in failure and efficiency. The flour business runner always do not think about themselves but always blame the quality of the flour mill equipment. In fact , the truth is that you should often check the condition and clean them if needed. Here are some following guidance for you.
  • Any machine will wear out and reduce its lifespan after a long period of operation. At this time, we can reduce the influence bring buy over operation of the equipment through regular lubrication, replacement of worn parts, and cleaning of material remaining in the gaps inside the machine. The impact of the medium, thus ensuring the production efficiency and the quality of the finished product powder, is followed by the operation of instructions to guide the formal operation. Improper operation will not only damage the flour mill equipment but also cause more serious accidents, resulting in production suspension.
Flour mill machine need lubrication

Therefore, as the person in charge of the flour production plant, we must pay attention to the above-mentioned contents. This is why our company will provide debugging and guidance training to every user, whether it is installing a stand-alone machine or a complete set of wheat processing equipment. The purpose is to enable flour processing equipment to perform better in the future, prolong the service life of the equipment and increase its processing capacity.

How can the flour mill equipment be properly maintained and fixed?

Generally, the flour mill equipment is used in a condition where dust flow around, with time goes by, more and more left on the flour mill equipment, it will leads to the cause of serious damage. It will not only makes the flour mill equipment worn out badly but also influence the quality of the flour powder. So the flour mill equipment must be regularly repaired and maintained.
What problems should we pay attention to when using and maintaining flour mill equipment on a daily basis?
  • First, the flour mill equipment should be placed in a place where the environment is suitable, the ground is flatness and should keep the condition cool and dry. Before using the flour mill machine, check the material store chamber to see if there is any impurity. Before the material is crushed, it must be inspected. Any impurities in the material must not be mixed to avoid damage to the wheat flour machine.
Clean the flour mill plant
  • During the use of the wheat flour machine, it is necessary to periodically check whether the fixing nut of the movable tooth plate is loosen or all the fastening parts are loosen or not. In particular, check the screws in the fixed sprocket. Before starting the machine, inject proper amount of lubricants. Increase the number of refuelings for continuous operation. When the actual work time is 300 hours, the spindle bearing must be serviced and replaced with new lubricant. When changing the wearing parts, the repairman should be familiar with the operation of the wheat flour machine, if there is a major damage to contact the manufacturer for repair the machine.
It is an necessary part of maintaining and fixing the flour mill equipment. Proper maintain will prolong the service life of the machine and brings more benefits, as a flour mill machine manufacture, we suggest you to check your machine time by time to make sure they can work well.

2018年5月20日星期日

Fruit Juice Processing Line Introduction

Fruit Juice Processing Equipment Introduction

(Fruit Washing Machine—Fruit Sorter—preheating machine—Pulping Machine—Belt Filter Press— Disc Centrifuge—Ultrafiltration—Mixing Tank—High Pressure Homogenizer—Vacuum Degasser—Vacuum Evaporation Machine—UHT Sterilizer—Hot Filling Machine—Continuous Spraying Sterilizer—Shrink—Plastic Casing Labe Machine—Wrap Around Case Packer)

Function of some equipment

Preheating machine: For juices it is essential that the original content of pectin shall be retained throughout the production. In this case, fruit enzymes must be inactivated during processing as soon as possible by a preheating process.
Clarify(Enzymatic Hydrolysis Tank) : For clear, filtered juices a breakdown of pectin is needed to enable a good yield and high degree of juice concentration, and this is done by adding specific pectolytic enzymes which hydrolise the pectin substances
Ultrafiltration system: To obtain clear juices, the enzymation is not the only steps required, but after that other phases such us sedimentation with fining agents, and ultrafiltration system are required.
Vacuum degasser: The contact with the air can be dangerous for fruits sensitive to oxidation, so, in some cases, it could be necessary to provide degasser system before the product packaging.

2018年5月11日星期五

Compelte Project of Charcoal/Biomass Briquette

With consumption on mineral resources mounting up, more people start to get interested in biomass resourses which is known as renewable energy. At present, there is several kinds of renewable energy technologies for utilizing agricultural residues or wood waste by converting them into biofuel.
Biomass Briquette Plant is to make biomass raw material into club-shaped briquette such as ricehusk bars, sawdust bars or charcoal bars. This is the simplest way to use renewable energy by burning as biofuel.
Establishing a biomass briquetting system is not a big invest for personal use. A small set of biomass briquette plant need a crusher, a dryer and a set of biomass briquette press.
For market sales, biomass briquette is also a good product for home used stove, barbecue resturant and boiler in factory. Barbecue briquette need high quality material which have no much smoke and poisonous emissions. For boiler in factory, almost all kinds of biomass material can be used.
Utilization of agricultural residues or wood wastes is often difficult due to their uneven and troublesome characteristics. The process of compaction of residues into biomass briquette which have higher density than the original raw material is known as densification or biomass briquetting.

2018年4月27日星期五

How to start a flour mill factory?

Why do we need flour mill factories?

According to the flours exist in the market, there are wheat flour, corn flour, rice flour, yam flour and so on. Flour is a necessities of life. So starting a flour mill factory is wise choice. Let’s see how can we start a flour mill factory?
Different kinds of flour

How to operate the flour mill equipment?

If you don’t have any experience in flour making, you had better hire some one with experience in operating flour mill machine, or you can have some training classes, go visit some flour mill factory to find how their machine works or find a flour mill machine supplier to provide you some suggestions.

How to select sit and purchase flour mill equipment?

It is time to find a perfect sit and a reliable supplier the moment you are thinking of running a flour mill factory. You need enough space to place your machines, store your raw materials and flours that already produced. In another way, you need take the position into consideration, the sit of your factory should be convenient in transportation. Find a reliable flour mill supplier to purchase your flour mill equipment. Hire some works with experience if needed.
Start your flour mill factory

Collect raw material

Flour mill factory need a lot of raw material, and the most common material is wheat and corn. The material is depend on the type of flour you want to produce. You can find a spot in the area where you can easily find materials. In the long run, the best choice is to find a wide field to grow wheat or other materials yourself. For a flour mill factory which just begins, it is better to buy grains form farmers.
Find stable clients
Once your factory is put into use, you need to sale your product in market, you’d better find at least a long term and stable client. You can start from biscuit factory or bread factory where they have a great demand of flour. Except for wholesale, you product also need to get into retail market, find some retail stores, supermarkets and so on.
flour ready to ssle

Quality of flour

As a new flour brand, your need to keep the quality of your flour, you can take some samples to the retailers so that they can experience what you have to offer in terms of flour texture, quality, color and taste.It is better to do your unique feature. Collect feed backs from your customers in order that you can make change on your formula of your flour. Your product also have to be competitive in price.