About Flyer Lipp silo
Lipp steel silo is also called Spiral steel silo. As a storage tool, the main role of the steel silo is to storage
grain, fly ash, slag powder, cement, chemical and so on.
Lipp steel silo double seam technology is a patented technology of the German technical engineer
called Xavef Lipp. It applies the principle of metal plastic working hardening and thin shell structure. Use special technology and equipment to apply 2 to 4 mm thick galvanized steel (or stainless steel). According
to the “spiral, double-seam and cleanching" process to create a Lipp
steel storage silo with a volume of 100 to 5000 m3.
Lipp steel silo, also known as spiral steel silo, as the name implies,
the whole silo body is spiraled and concatenated by using professional
equipment. T
he Lipp technical silo has a short construction period, a relatively low cost, and a good quality. It occupies a small area, has no scaffolding on the floor to install the silo top, and is easy to construct.
In recent years, due to the superior performance and other advantages
of Lipp silo, the steel silos have quickly occupied the silo market.
Steel silos now are wildly used in grain storage and other industrial
powder storage.
Preparation of steel storage silo
Customized design
Once the order is settled. Generally, customers need to provide their
design drawing of the steel silo.
We can also provide free design for customers. Customers are required
to provide our designing team detail data such as material to contain,
field scale, special demand and so on. The design drawing must be
confirmed by both customers and our company to make sure the safety and
the veracity, also to avoid unnecessary divergence.
Preferential Capacity Table
This is a table that summarized by our technology with years experience
and test, this table is a reference to these who have no idea how large
their want their silos to be. According to this table. The standard silo
is both aesthetically and practically.
The minimum diameter of the
steel storage silo is 3meters and the maximize is 28 meters. The angle
of the conical top is recommend to be 15°.
|
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
17 |
18 |
19 |
20 |
21 |
22 |
23 |
24 |
25 |
4 |
75 |
88 |
100 |
113 |
126 |
138 |
151 |
163 |
176 |
188 |
201 |
|
|
|
|
|
|
|
|
|
5 |
118 |
137 |
157 |
177 |
196 |
216 |
236 |
255 |
275 |
295 |
314 |
334 |
353 |
|
|
|
|
|
|
|
6 |
|
|
226 |
254 |
283 |
311 |
339 |
367 |
396 |
424 |
452 |
480 |
509 |
|
|
|
|
|
|
|
7 |
|
|
|
|
385 |
423 |
462 |
500 |
539 |
577 |
615 |
654 |
693 |
731 |
770 |
|
|
|
|
|
8 |
|
|
|
|
502 |
553 |
603 |
653 |
703 |
754 |
804 |
854 |
904 |
955 |
1005 |
1056 |
1106 |
|
|
|
9 |
|
|
|
|
|
|
763 |
827 |
890 |
954 |
1017 |
1081 |
1145 |
1208 |
1272 |
1336 |
1400 |
|
|
|
10 |
|
|
|
|
|
|
942 |
1021 |
1099 |
1178 |
1256 |
1335 |
1413 |
1492 |
1570 |
1649 |
1728 |
|
|
|
11 |
|
|
|
|
|
|
1140 |
1235 |
1330 |
1425 |
1520 |
1615 |
1710 |
1805 |
1900 |
1996 |
2091 |
|
|
|
12 |
|
|
|
|
|
|
1356 |
1470 |
1583 |
1696 |
1808 |
1922 |
2035 |
2148 |
2261 |
2374 |
2487 |
2601 |
2714 |
2827 |
13 |
|
|
|
|
|
|
1592 |
1725 |
1857 |
1990 |
2122 |
2255 |
2388 |
2521 |
2653 |
2786 |
2919 |
3053 |
3186 |
3318 |
14 |
|
|
|
|
|
|
|
|
|
2308 |
2462 |
2616 |
2769 |
2923 |
3077 |
3231 |
3385 |
3559 |
3695 |
3848 |
15 |
|
|
|
|
|
|
|
|
|
2649 |
2826 |
3003 |
3179 |
3356 |
3533 |
3709 |
3886 |
4062 |
4241 |
4418 |
16 |
|
|
|
|
|
|
|
|
|
|
|
|
3617 |
3818 |
4019 |
4220 |
4421 |
4624 |
4825 |
5027 |
17 |
|
|
|
|
|
|
|
|
|
|
|
|
4048 |
4310 |
4537 |
4764 |
4991 |
|
|
|
18 |
|
|
|
|
|
|
|
|
|
|
|
|
4578 |
4832 |
5087 |
5341 |
5595 |
|
|
|
19 |
|
|
|
|
|
|
|
|
|
|
|
|
5101 |
5384 |
5668 |
5951 |
6234 |
|
|
|
20 |
|
|
|
|
|
|
|
|
|
|
|
|
5652 |
5966 |
6280 |
6594 |
6908 |
|
|
|
22 |
|
|
|
|
|
|
|
|
|
|
|
|
6842 |
7223 |
7603 |
1982 |
8362 |
|
|
|
24 |
|
|
|
|
|
|
|
|
|
|
|
|
8143 |
8595 |
9048 |
|
|
|
|
|
25 |
|
|
|
|
|
|
|
|
|
|
|
|
8835 |
9326 |
9817 |
|
|
|
|
|
Semi-finished steel parts
Because of filed limited, some welded parts will be pre-manufactured and
packed in our factory before delivery to best save cost on construction
site and shorten construction duration. These may include all accessory
parts, steel plate and other parts. Our steel plate and all accessories
are all made of galvanized steel sheet.
On site construction procedure of Flyer steel storage silo
There are seven steps for on site construction procedure. The core of
the construction is by using our spiral folding technology, it is also a
symbol of Lipp silo unique technology which is different from other
type of steel storage silo.
The main equipment that used in the construction process are decoiling
machine, forming machine, bending machine and supporting bears. The use
of these equipment will be introduced elaborately in the following
steps.
steel silo on site construction
Equipment location
The first thing to do is locate all the necessary equipment on the
decided on site location. There should be prepared concrete base or
steel frame base. The selection of base is depend on different elements.
P.S. The base construction does not contained in our bossiness scope.
The diameter of the base is according to the size of the steel storage
silo. When all the equipment are settled in the correct place, the
construction of steel storage silo process can be started.
Silo bending
First of all, Use the decoiling machine to decoil the galvanized steel
strip coils. During the construction process, the decoiled steel strip
will be delivered to the forming machine. The forming machine will bend
the steel strips to a certain radian according to the request of the
target steel storage silo. With the help of silo forming machine, the
bended steel strips after the bending machine can be seamed together to
the double-seam system.
When the steel galvanized steel strip coils formed into double system,
we need to use supporting bears to support the whole construction of the
silo and make sure with the help of bearing support, the whole
structure can keep rising.
Silo roof installation
Accompanying with the rising of the whole body, when the main body of
the silo raises to a certain height, normally 2 meters high. Our workers
will start to install the roof of the silo. Because the height of silo
is range from 6 meters to 25meters, which is too high that the safety of
workers can not be guaranteed. After the installation of the roof, the
forming and bending will continue and the silo will keep raising.
Stiffeners fixing
With the raising of the silo, our worker will start to weld the steel
stiffeners. Steel stiffeners are used to help the structure of the silo
more stable and makes the silo lasting long and hard to collapse. We
also use double stiffener plates to ensure the stability of stiffeners.
Silo lifting
For some small diameters steel storage silos or silos built on the
ground. We usually use a crane to lift the whole body to load the steel
silo on the basement. The main part of the silo has been complete.
Auxiliary equipment installation
After finished the silo body construction. Customers will always order
some auxiliary equipment fixed on the silo that used to maintain and
check the condition of the silo. There are some necessary auxiliary
equipment, such as roof air vent, used to keep the air flowing, the
ladder system, build by the side of the silo, and other auxiliary to
make up the whole silo system.
We undertake turn key project from equipment location to auxiliary
equipment installation, this does not only because we can ensure the
quality of whole parts but also you can get the most cost effective
offer.
If you get any question, you can send us e-mail, we are wiling to answer your questions.